![]()
Design and implementation of Autonomous Solar system – OFF GRID.
Installation Location: Vereda Cajamarca GPAD Mayor's Office Ibagué – Tolima.
Client: Ibagué Mayor's Office – Tolima.
Project description: Designed and implemented an autonomous solar system, with the capacity to power equipment with a repeater antenna 24 hours a day.
![]()
Installed capacity
![]()
Panel numbers
![]()
Panel capacity
![]()
Tons avoided