Design and implementation autonomous solar system (OFF GRID) Public Lighting.
Installation Location: Carrera 7 between Calle 8 and 9, Venadillo Municipality - Tolima.
Client: AR Venadillo Paving Consortium.
Project description: Design of the metal poster, Photometric Study of the road, Supply and installation of 12 80 W all-in-one solar lamps.
Installed capacity
Panel numbers
Panel numbers
Panel numbers